Our Clients
Since 1988 our team has worked tirelessly to serve the needs of the people all over the island. Today our clientele of more than 500 spans across multiple sectors such as F&B, Banking, Manufacturing, Engineering and many others.
PUB Works
Year |
Client |
Job Title |
2016 |
PUB |
Servicing and maintenance of screening, sludge, grit and related equipment at Kranji WRP |
2016 |
PUB |
To supply ceramic discs (fused alumina) for northworks aeration units |
2016 |
PUB |
Maintenance of cable pit pump systems for DTL1 stations |
2016 |
PUB |
Service and maintenance of heat exchangers for chiller at Changi WRP |
2016 |
PUB |
To inspect and overhaul 2nd stage AU tank at LTM |
2015 |
PUB |
To service 12 inch sluice gate valve |
Water Tank Works
Year |
Client |
Job Title |
2016 |
Ardmore II |
Replacement of ball float valve at basement water tank |
2016 |
Ascendas Singapore |
Water tank upgrading works to The Gemini, The Alpha, The Aries, The Capricorn and The Galen |
2016 |
DN Hybrid Pte Ltd |
Replacement of domestic water tank at 12 Thomson Hill |
2016 |
HarbourFront Centre Pte Ltd |
To install lining in stainless steel tank at Harbourfront Centre |
2016 |
Rivergate |
Annual water tank certification by PUB Licensed Plumber |
2016 |
Starville |
To replace ball float valve at potable water tank |
2016 |
Sui Generis |
Annual water tank certification by PUB Licensed Plumber |
2016 |
Tanglin Trust School |
Annual water tank certification by PUB Licensed Plumber |
2016 |
The Springbloom |
Annual water tank certification by PUB Licensed Plumber |
2016 |
Vista Real Estate Investments Pte Ltd |
To replace domestic water tanks and accessories at PSA Vista |
2015 |
ABI Plaza |
Annual water tank certification by PUB Licensed Plumber |
2015 |
Sui Generis |
To install sampling taps at potable water tanks |
2015 |
The Sterling |
Annual water tank certification by PUB Licensed Plumber |
Replacement of Pump Systems and Accessories
Year |
Client |
Job Title |
2016 |
Bukit Panjang Plaza |
To dismantle and replace kitchen waste pipe |
2016 |
Chiltern Park |
To replace booster pump at block 131 rooftop |
2016 |
City Square Mall |
Replacement of waste pipe at City Square Mall |
2016 |
Sutton Place |
To replace booster pump at block 26b and 28c rooftop |
2016 |
Tanglin Trust School |
To replace pump system accessories at Junior block |
2016 |
Water Place Condominium |
To replace waste pipe at basement carpark |
2015 |
Gardens By The Bay |
To replace piping for water features |
2015 |
Modena |
To replace pressure tank at block 35a rooftop |
2015 |
Six Battery Road |
To replace 6" ductile iron piping at basement |
2015 |
Spring Grove |
To replace pump and valves at block 53a rooftop |
2015 |
The American Club |
To replace valves for water heater at basement |
Regular Preventive / Predictive Maintenance
Year |
Client |
Job Title |
2015 |
JTC |
Regular preventive maintenance of pump systems at JTC factories |
Other Works
Year |
Client |
Job Title |
2016 |
Bukit Panjang Plaza |
To install private water meters |
2016 |
Metta School |
To replace 2 nos. of 240V ventilation fans |
2016 |
The American Club |
Replacement of water heater at Basement |
2016 |
Waterbank at Dakota |
To replace ventilation fans at rooftop and basement |